ECO TRANSFORMER
Assembly
In other sectios, the winding, core and mechanical parts that are completed are brought to this section.
After the assembly of the active part of the transformer is completed, it is dried under vacuum in an automatic smart oven. Then, the active section is placed in the pre-prepared transformer boiler an closed. It is placed in an oil-filled oven to press oil.
After the winding is finished in the dry type transformer, epoxy resin casting is made under vacuum with our sensitive and it ready for assembly.